$634,420,201
to BARNARD SPENCER JOINT VENTURE
CONSTRUCT 23 MILES OF BORDER WALL SYSTEM AND 81 MILES OF SYSTEM ATTRIBUTES.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Modification to ongoing border wall construction contract: 23 miles of wall system and 81 miles of related infrastructure through April 2028.
This $633.6 billion obligation represents a major increment to CBP's southern border barrier program, which remains a centerpiece of U.S. immigration enforcement policy.
Large-scale construction demand for steel, concrete, surveillance systems, and heavy equipment; sustained work through 2028 supports regional construction and materials suppliers.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002853.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C25F00001008_7014_70B01C23D00000008_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.