$119,681,706
to INDIANA DEPARTMENT OF TRANSPORTATION
I65, ADDED TRAVEL LANES, FROM US 50 TO SR 58, BARTHOLOMEW COUNTY, R-28940
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds construction of added travel lanes on Interstate 65 in Indiana between US Route 50 and State Road 58.
Improves regional highway capacity and traffic flow on a major north-south corridor connecting the Midwest.
Drives demand for construction materials, heavy equipment, asphalt, concrete, and engineering services in the region.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002052.
- 2026-04-02PROJECT TITLE: I70, ADDED TRAVEL LANES, 0.8 MILES WEST OF US 35 TO 0.26 MI E OF US 40 (INDIANA/OHIO ST LN), WAYNE COUNTY, R-43375 :::: PROJECT DESCRIPTION: R-43375 - DES 2002423 ADDED TRAVEL LANES ON I70 IN WAYNE COUNTY GREENFIELD DISTRICT$158.6M
- 2026-03-18PROJECT TITLE: I70, ADDED TRAVEL LANES, 0.8 MILES WEST OF US 35 TO 0.26 MI E OF US 40 (INDIANA/OHIO ST LN), WAYNE COUNTY, R-43375 :::: PROJECT DESCRIPTION: R-43375 - DES 2002423 ADDED TRAVEL LANES ON I70 IN WAYNE COUNTY GREENFIELD DISTRICT$97.0M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_180501212Z460_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.