The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$75,442,392

Department of Transportation·Federal Highway Administration

to ALABAMA DEPARTMENT OF TRANSPORTATION

WORK BEGAN·LATEST ACTION2026-04-17·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22330000Y001ALI065543_069
Award description

PROJECT TITLE: BRIDGE WIDENING ON I-65 FROM .57 MILES SOUTH OF BUCK CREEK TO 1 MILE NORTH OF SR-3 (US-31) IN ALABASTER BIN #006489 AND #006490 OVER L AND N RR, BIN :::: PROJECT DESCRIPTION: BRIDGE WIDENING ON I-65 FROM .57 MILES SOUTH OF BUCK CREEK TO 1 MILE NORTH OF SR-3 (US-31) IN ALABASTER BIN #006489 AND #006490 OVER L AND N RR, BIN #006491 AND #006492 OVER CR-26 AND BIN #006493 AND #006494 OVER L AND N RR/CR-87

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds bridge widening on Interstate 65 in Alabaster, Alabama, spanning multiple structures over railroad and county roads.

Sub-sectors
highway-infrastructurefhwa-formula-grantbridge-widening
Why this matters

Part of ongoing federal highway maintenance and capacity improvements supporting regional freight and passenger mobility on a major north-south corridor.

Supply-chain signal

Supports demand for construction materials, engineering services, and heavy equipment rental in Alabama's transportation infrastructure sector.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-02. Cost: $0.002857.

Period of performance
Start
End
2033-12-31
Status
activein 2741 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$75.4M Department of Transportation — The Buildout — The Buildout