$464,640,633
to CLARK CONSTRUCTION GROUP LLC
DESIGN BUILD FCI LEAVENWORTH
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Design-build contract for Federal Correctional Institution Leavenworth renovation and modernization, ongoing since August 2023.
BOP infrastructure modernization addresses aging federal prison facilities and operational capacity; this 2023 project received a modification in April 2026.
Sustained demand for construction labor, materials, and design services in federal prison modernization; Clark Construction's involvement signals major general contractor capacity in government infrastructure.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002812.
- 2026-06-24DESIGN-BUILD CONSTRUCTION OF THE VETERANS AFFAIRS HEALTH CARE CENTER, EL PASO, TX$620.2M
- 2026-06-23IRA: PROVIDE LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT TO CONSTRUCT THE NEW CISA HQ BUILDING. SERVICES INCLUDE, BUT ARE NOT LIMITED: CIVIL AND SITE WORK CONSISTING OF HEAVY EARTH WORK, ETC.EXCAVATION, STABILIZATION OF EXISTING SLOPE, FOUNDATIONS$580.3M
- 2026-04-20C104688- CONSTRUCTION OF MULTIPLE LEVEL PARKING GARAGE AT NIH, BETHESDA. THE PROJECT IS ESSENTIAL TO ALIGN WITH THE NATIONAL CAPITAL PLANNING COMMISSION PARKING RATIO AT BETHESDA CAMPUS.$51.6M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_15B70023C00000008_1540_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.