The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$81,299,966

Department of Transportation·Federal Highway Administration

to ARKANSAS DEPARTMENT OF TRANSPORTATION

WORK BEGAN·LATEST ACTION2026-05-19·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22330000Y001AR0551151_069
Award description

PROJECT TITLE: HWY. 181 - HWY. 158 (S) :::: PROJECT DESCRIPTION: RECONSTRUCTION; POLYMER OVERLAY ON 4 BRIDGES

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds reconstruction and polymer overlay work on four bridges along Highway 181–Highway 158 South in Arkansas.

Sub-sectors
highway-infrastructurebridge-reconstructionfhwa-formula-grant
Why this matters

Bridge maintenance is critical infrastructure upkeep; polymer overlays extend service life and reduce long-term replacement costs.

Supply-chain signal

Drives demand for bridge materials, polymer coatings, and construction labor in Arkansas; supports regional construction supply chains.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-31. Cost: $0.002712.

Period of performance
Start
End
2028-09-30
Status
activein 823 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$81.3M Department of Transportation — The Buildout — The Buildout