The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$47,784,784

Department of Transportation·Federal Highway Administration

to COLORADO DEPARTMENT OF TRANSPORTATION

WORK BEGAN·LATEST ACTION2026-05-19·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22430000Y800CO0703515_069
Award description

PROJECT TITLE: I-70 FLOYD HILL PACKAGE 2 WEST SECTION :::: PROJECT DESCRIPTION: I-70 FLOYD HILL PACKAGE 2 WEST SECTION-I-70 TOP OF FLOYD HILL TO VETERANS MEMORIAL TUNNELS-ADD A WESTBOUND LANE FROM BEAVER BROOK TO VET TUNNELS, REPLACE BRIDGES

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Constructs westbound lane expansion and bridge replacement on I-70 in Colorado's Floyd Hill section.

Sub-sectors
highway-constructionfhwa-formula-grantbridge-replacement
Why this matters

I-70 Floyd Hill is a critical bottleneck for transcontinental commerce, tourism, and mountain-corridor capacity.

Supply-chain signal

Drives demand for steel, concrete, heavy equipment rental, and construction labor across Colorado.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-11. Cost: $0.009924.

Period of performance
Start
End
2029-01-30
Status
activein 945 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$47.8M Department of Transportation — The Buildout — The Buildout