$32,220,328
to TRANSPORTATION NORTH CAROLINA DEPARTMENT
PROJECT TITLE: 2024 TS HELENE – PERMANENT REPAIRS TO US 176 IN POLK COUNTY (DIVISION 14) :::: PROJECT DESCRIPTION: 'PERMANENT REPAIRS TO US 176 IN POLK COUNTY (DIVISION 14) - US 176 (ROUTE ID 20000176075) BETWEEN MM 2.2 AND 4.9 CONTRACT C205165 SCOPE OF WORK INCLUDES EROSION CONTROL, GRADING, PAVING, PAVEMENT MARKING, SLOPE STABILIZATION AND TRAFFIC CONTROL. REPAIRS ARE NECESSARY TO RESTORE THE ROADWAY TO ITS PRE-DISASTER CONDITION; CONSTRUCTION IS IN COMPLIANCE WITH NCDOT’S CURRENT CODES AND STANDARDS.'
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Permanent repairs and stabilization of US Route 176 in North Carolina following Hurricane Helene damage, including erosion control and paving.
Maintains critical regional transportation networks post-hurricane as part of broader federal disaster resilience investment.
Increases demand for asphalt, concrete, construction equipment, and labor; improves freight movement through North Carolina's eastern region.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-17. Cost: $0.010213.
- 2026-06-03PROJECT TITLE: CM/GC - 2024 HURRICANE HELENE - PERMANENT REPAIRS TO I-40 IN HAYWOOD COUNTY :::: PROJECT DESCRIPTION: HIGHWAY RECONSTRUCTION OF I-40 THROUGH PIGEON RIVER GORGE FROM THE TENNESSEE STATE LINE (MILEMARKER 0.0) TO TOM HALL BRANCH (MILEMARKER 5.0) WHICH IS EAST OF THE I-40 DOUBLE CONCRETE ARCH TUNNELS. SEE STATE REMARKS FOR EARLY WORK PACKAGE DETAILS AND SCOPE. ADD EARLY WORK PACKAGE (EWP)#1 (2/19/2025).$1.0B
- 2026-06-03PROJECT TITLE: I-26 FR NC 146 (LONG SHOALS RD) @ EXIT 37 TO I-40 :::: PROJECT DESCRIPTION: I-26 FR NC 146 (LONG SHOALS RD) @ EXIT 37 TO I-40; ADD ADDITIONAL LANES$245.6M
- 2026-04-17PROJECT TITLE: NEW ROUTE - FORSYTH COUNTY :::: PROJECT DESCRIPTION: NORTHERN BOUND EASTERN SECTION (FUTURE I-74) FROM I-40 BUS/US 421; DRAINAGE, GRADING, PAVING, SIGNALS, STRUCTURES$205.5M
- 2026-05-19PROJECT TITLE: I-40/I-85 TO THE DURHAM COUNTY LINE :::: PROJECT DESCRIPTION: I-40/I-85 TO THE DURHAM COUNTY LINE; WIDEN TO 6 LANES & INSTALL ITS$153.6M
- 2026-05-19PROJECT TITLE: FAYETTEVILLE - OUTER LOOP FR S OF SR 1003 (CAMDEN RD) TO S OF SR 1104 (STRICKLAND BRIDGE RD) :::: PROJECT DESCRIPTION: FAYETTEVILLE - OUTER LOOP FR S OF SR 1003 (CAMDEN RD) TO S OF SR 1104 (STRICKLAND BRIDGE RD)$120.1M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22640000ER05NCER24307_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.