The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$775,059,791

National Aeronautics and Space Administration·National Aeronautics and Space Administration

to CALIFORNIA INSTITUTE OF TECHNOLOGY

aerospaceactiveONGOING · MOD OF 2018 CONTRACT
WORK BEGAN2018-10-01·LATEST ACTION2026-04-03·SOURCEUSASPENDING·SOURCE IDCONT_AWD_80NM0018F0710_8000_80NM0018D0004_8000
Award description

NASA ISRO SYNTHETIC APERTURE RADAR (NISAR) MISSION 89-17620

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the NASA-ISRO Synthetic Aperture Radar (NISAR) mission, a joint Earth-observation satellite launched in 2018.

Sub-sectors
earth-observation-satellitenasa-missioninternational-partnership
Why this matters

NISAR provides critical radar imaging for disaster response, climate monitoring, and agricultural assessment across the Indo-Pacific region.

Supply-chain signal

Caltech manages mission operations and science data processing; signals sustained demand for satellite ground systems and radar payload expertise.

U.S.–China competition angle

NISAR strengthens U.S.-India space partnership and provides independent Earth-observation capability in the Indo-Pacific, countering Chinese satellite dominance in regional monitoring.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002966.

Period of performance
Start
2018-10-01
End
2028-09-30
Status
activein 823 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$775.1M National Aeronautics and Space Administration — The Buildout — The Buildout