$641,277,600
Department of Homeland Security·U.S. Customs and Border Protection
justiceactive
WORK BEGAN2026-03-05·LATEST ACTION2026-05-22·SOURCEUSASPENDING·SOURCE IDCONT_AWD_70B01C26F00000188_7014_70B01C26D00000008_7014
Award description
RGV-3 WATERBORNE BARRIER CONSTRUCTION PROJECT
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Construction of waterborne barrier infrastructure for the Rio Grande Valley border sector.
Sub-sectors
border-securitycbp-infrastructurewaterborne-barriers
Why this matters
Part of CBP's physical border security modernization; RGV is a high-traffic crossing point.
Supply-chain signal
Demand for marine-grade construction materials, barrier systems, and installation contractors in South Texas.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002573.
Period of performance
Start
2026-03-05
End
2027-03-31
Status
activein 274 days
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B01C26F00000188_7014_70B01C26D00000008_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.