The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$314,011,569

National Aeronautics and Space Administration·National Aeronautics and Space Administration

to ASTROBOTIC TECHNOLOGY INC

aerospaceactiveONGOING · MOD OF 2020 CONTRACT
WORK BEGAN2020-06-11·LATEST ACTION2026-06-18·SOURCEUSASPENDING·SOURCE IDCONT_AWD_80JSC020F0220_8000_80HQTR19D0005_8000
Award description

VOLATILES INVESTIGATING POLAR EXPLORATION ROVER (VIPER) DELIVERY

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the VIPER lunar rover contract, which began in 2020 and is scheduled for delivery by October 2026.

Sub-sectors
nasa-lunar-explorationrover-developmentm&o-contract
Why this matters

VIPER is NASA's flagship mission to map water ice at the lunar south pole, critical for sustaining human exploration and establishing a lunar resource base.

Supply-chain signal

Astrobotic's delivery timeline depends on suppliers of advanced robotics, power systems, and scientific instruments; delays ripple across NASA's lunar architecture.

U.S.–China competition angle

U.S. lunar exploration capability directly counters China's aggressive lunar program; VIPER's success demonstrates American technological leadership in space resource prospecting.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-19. Cost: $0.002997.

Period of performance
Start
2020-06-11
End
2026-10-31
Status
activein 123 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$314.0M National Aeronautics and Space Administration — The Buildout — The Buildout