The BuildoutBeta

$214,934,133

Department of Transportation·Federal Highway Administration

to GRANITE CONSTRUCTION COMPANY

transportationexpiring · 51d· period of performance ends in 51 daysONGOING · MOD OF 2023 CONTRACT
WORK BEGAN2023-01-04·LATEST ACTION2026-06-16·SOURCEUSASPENDING·SOURCE IDCONT_AWD_69056723C000008_6925_-NONE-_-NONE-
Award description

THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Modification to ongoing 2023 highway contract to span Pretty Rocks landslide with construction services across two option phases.

Sub-sectors
highway-constructionlandslide-mitigationfhwa-infrastructure
Why this matters

Landslide stabilization on active federal highway corridors prevents infrastructure failure and maintains critical transportation routes.

Supply-chain signal

Ongoing work signals sustained demand for heavy construction equipment, concrete, and geotechnical engineering services through mid-2026.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-21. Cost: $0.002802.

Period of performance
Start
2023-01-04
End
2026-08-20
Status
expiring · 51din 51 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.