The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$214,934,133

Department of Transportation·Federal Highway Administration
transportationexpiring · 66d· period of performance ends in 66 days
ACTION DATE2026-03-16·SOURCEUSASPENDING·SOURCE IDCONT_AWD_69056723C000008_6925_-NONE-_-NONE-
Award description

THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Pre-construction and construction services to span an active landslide on a highway with a 475-foot structure.

Sub-sectors
highway-infrastructurelandslide-mitigation
Why this matters

Addresses critical infrastructure resilience by stabilizing active geological hazards that threaten transportation networks.

Supply-chain signal

Drives demand for specialized heavy construction equipment, geotechnical engineering services, and structural materials suppliers.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-14. Cost: $0.001228.

Period of performance
Start
2023-01-04
End
2026-07-20
Status
expiring · 66din 66 days
Sources
  • Award record ingested from usaspending. Source identifier CONT_AWD_69056723C000008_6925_-NONE-_-NONE-.

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.