The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$220,065,715

National Aeronautics and Space Administration·National Aeronautics and Space Administration

to PERATON INC.

aerospaceexpiredONGOING · MOD OF 2015 CONTRACT
WORK BEGAN2015-02-01·LATEST ACTION2026-04-30·SOURCEUSASPENDING·SOURCE IDCONT_AWD_NNG15WA53C_8000_-NONE-_-NONE-
Award description

IGF::CT::IGF OPERATIONS AND MANAGEMENT OF THE NASA BALLOON FACILITY

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Operations and management of NASA's balloon facility, an ongoing contract that began in 2015.

Sub-sectors
nasa-operationsballoon-facility-m&olong-term-contract
Why this matters

NASA's high-altitude balloon program enables scientific research and technology testing in near-space environments at lower cost than orbital missions.

Supply-chain signal

Peraton sustains a specialized workforce and supply chain for balloon systems, ground operations, and scientific payload integration.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-20. Cost: $0.002736.

Period of performance
Start
2015-02-01
End
2025-04-30
Status
expired426 days ago
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$220.1M National Aeronautics and Space Administration — The Buildout — The Buildout