The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$131,865,944

Department of Homeland Security·U.S. Coast Guard

to WHITING-TURNER CONTRACTING COMPANY, THE

defenseactive
ACTION DATE2026-05-12·SOURCEUSASPENDING·SOURCE IDCONT_AWD_70Z04722F43000010_7008_70Z04718DWHITUR00_7008
Award description

DESIGN BUILD CHARLESTON PIER PAPA RECAPITALIZATION, USCG BASE CHARLESTON, CHARLESTON SC

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Design and build recapitalization of Charleston Pier Papa at USCG Base Charleston, South Carolina.

Sub-sectors
military-base-infrastructuredesign-build-contractuscg-operations
Why this matters

Critical infrastructure modernization for Coast Guard operations supporting maritime security and readiness on the Atlantic coast.

Supply-chain signal

Large design-build contract will drive demand for construction materials, engineering services, and maritime infrastructure suppliers in the Southeast.

U.S.–China competition angle

Strengthens U.S. Coast Guard operational capacity in Atlantic waters amid increased maritime domain awareness requirements.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002137.

Period of performance
Start
2022-07-25
End
2026-11-21
Status
activein 188 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$131.9M Department of Homeland Security — The Buildout — The Buildout