$120,206,096
to LEIDOS, INC.
THIS DELIVERY ORDER IS FOR MULTI- ENERGY PORTALS.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Delivery order for multi-energy portal systems supporting U.S. Customs and Border Protection operations at ports of entry.
CBP modernization of border infrastructure enhances screening capacity and operational efficiency at critical chokepoints.
Leidos will source or integrate energy management and portal technology components; signals demand for ruggedized, high-throughput inspection systems.
Border security modernization reflects U.S. focus on controlling goods and intelligence flows at entry points amid trade tensions.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002168.
- 2026-03-12HUD PHASE II CONTACT CENTER$136.5M
- 2026-05-07SENTINEL NETWORK SERVICES$93.0M
- 2026-03-05NEXT GENERATION IT SERVICES (NGITS) ENGINEERING TASK ORDER SERVICES$76.6M
- 2026-04-22ADVANCED RESEARCH PROJECTS AGENCY FOR HEATH (ARPA-H) INFORMATION TECHNOLOGY SUPPORT SERVICES$74.5M
- 2026-05-12CJIS FAST- BIOMETRIC SERVICES$46.5M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70B03C21F00001130_7014_70B03C21D00000004_7014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.