The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$178,975,557

National Aeronautics and Space Administration·National Aeronautics and Space Administration

to ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC.

aerospaceactive
ACTION DATE·SOURCEUSASPENDING·SOURCE IDCONT_AWD_80GSFC19C0054_8000_-NONE-_-NONE-
Award description

THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Design phase funding for the science operations center supporting NASA's Wide-Field Infrared Survey Telescope mission.

Sub-sectors
space-telescopesscientific-instrumentationmission-operations
Why this matters

WFIRST is a flagship NASA observatory for deep-space infrared astronomy and dark energy research, critical to U.S. scientific leadership.

Supply-chain signal

Signals demand for specialized aerospace systems integration, infrared detector technology, and mission control software from U.S. contractors and subcontractors.

U.S.–China competition angle

WFIRST represents U.S. commitment to advanced space-based astronomy capabilities, competing with international space programs in scientific discovery.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-13. Cost: $0.001448.

Period of performance
Start
2019-07-01
End
2027-09-30
Status
activein 504 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.