$36,477,635
to STRIDER CONSTRUCTION CO INC
CONSTRUCTION SERVICES FOR PROJECT OR NPS CRLA 2018(1), CLEETWOOD TRAIL AND MARINA IMPROVEMENTS. THE WORK CONSISTS OF AGGREGATE BASE TRAIL RECONSTRUCTION, SLOPE STABILIZATION, SLOPE PROTECTION, WALLS (DRY STACK ROCKERY, SOIL NAIL, GABION, MECHANICALLY
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Construction services for Cleetwood Trail and Marina improvements at Crater Lake National Park, including trail reconstruction and slope stabilization work.
Maintains critical recreational infrastructure and public access at a major national park, supporting tourism and visitor safety.
Signals demand for aggregate materials, rockery, soil stabilization products, and heavy construction equipment suppliers serving federal infrastructure projects.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002095.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_69056726C000005_6925_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.