Awards/PROJECT GRANT (B)

$217,027,036

Department of Transportation·Federal Highway Administration

to MARYLAND DEPARTMENT OF TRANSPORTATION

transportationactiveONGOING · MOD OF 2025 CONTRACT
WORK BEGAN2025-07-03·LATEST ACTION2026-04-02·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22640000ER05MD1151028_069
Award description

PROJECT TITLE: FRANCIS SCOTT KEY (FSK) BRIDGE REBUILD PDB PHASE II :::: PROJECT DESCRIPTION: CONSTRUCTION - PHASE II OF PROGRESSIVE DESIGN BUILD (PDB) - ER PERMANENT REPAIR

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Phase II of the Francis Scott Key Bridge rebuild in Maryland, a progressive design-build reconstruction project scheduled through 2033.

Sub-sectors
highway-infrastructurebridge-reconstructionfhwa-grant
Why this matters

The FSK Bridge is a critical Baltimore harbor crossing; this $217M increment funds ongoing permanent repair work begun in July 2025.

Supply-chain signal

Sustained demand for heavy construction materials, engineering services, and bridge fabrication over the multi-year rebuild timeline.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-21. Cost: $0.002788.

Period of performance
Start
2025-07-03
End
2033-12-30
Status
activein 2740 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$217.0M Department of Transportation — The Buildout — The Buildout