The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$102,725,184

Department of Health and Human Services·National Institutes of Health

to POTOMAC ELECTRIC POWER CO

energyactiveONGOING · MOD OF 2024 CONTRACT
WORK BEGAN2024-09-30·LATEST ACTION2026-05-12·SOURCEUSASPENDING·SOURCE IDCONT_AWD_75N99024F00038_7529_47PA0420D0064_4740
Award description

C107469 ELECTRICAL SUBSTATION UPGRADE PHASE 1A

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: medium
In plain English

Upgrade electrical substation infrastructure at an NIH facility to modernize power distribution capacity and reliability.

Sub-sectors
grid-infrastructureelectrical-substationfederal-facility-modernization
Why this matters

Critical infrastructure modernization ensures uninterrupted power to biomedical research operations; aging grid upgrades reduce downtime risk.

Supply-chain signal

Demand for high-voltage electrical equipment, transformers, and switchgear from domestic and international suppliers; modernization cycle may accelerate across federal labs.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-28. Cost: $0.002774.

Period of performance
Start
2024-09-30
End
2028-05-31
Status
activein 701 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.