$191,550,000
Department of Transportation·Federal Transit Administration
transportationactive
ACTION DATE2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_NY-2016-035_069
Award description
RESILIENCY - SI FERRIES EDC LANDINGS
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Funds resilience improvements for Staten Island ferry landings and infrastructure in New York City.
Sub-sectors
public-transitresilience-infrastructureferry-systems
Why this matters
Strengthens critical public transportation infrastructure resilience against climate and operational disruptions in a major U.S. metropolitan area.
Supply-chain signal
Drives demand for maritime construction materials, engineering services, and resilience-focused infrastructure upgrades from regional suppliers.
Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-14. Cost: $0.001206.
Period of performance
Start
1999-10-01
End
2027-09-30
Status
activein 503 days
Sources
- Award record ingested from usaspending. Source identifier ASST_NON_NY-2016-035_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.