$1,550,689,354
DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Latest obligation on the 2019 NASA Space Launch System Mobile Launcher 2 design and construction contract with Bechtel.
ML2 is critical infrastructure for NASA's Artemis lunar program and deep-space exploration; this 2026 modification sustains a multi-billion-dollar national capability.
Bechtel's role as prime integrator drives demand across heavy construction, structural steel, welding, and specialized aerospace suppliers in the launch-infrastructure supply chain.
SLS/Artemis is central to U.S. leadership in human spaceflight and lunar return; sustaining ML2 counters China's advancing space ambitions.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.003086.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_80KSC019C0013_8000_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.