The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$1,550,689,354

National Aeronautics and Space Administration·National Aeronautics and Space Administration

to BECHTEL NATIONAL, INC.

aerospaceexpiredONGOING · MOD OF 2019 CONTRACT
WORK BEGAN2019-07-01·LATEST ACTION2026-05-06·SOURCEUSASPENDING·SOURCE IDCONT_AWD_80KSC019C0013_8000_-NONE-_-NONE-
Award description

DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the 2019 NASA Space Launch System Mobile Launcher 2 design and construction contract with Bechtel.

Sub-sectors
space-launch-infrastructurenasa-slsm&o-contract
Why this matters

ML2 is critical infrastructure for NASA's Artemis lunar program and deep-space exploration; this 2026 modification sustains a multi-billion-dollar national capability.

Supply-chain signal

Bechtel's role as prime integrator drives demand across heavy construction, structural steel, welding, and specialized aerospace suppliers in the launch-infrastructure supply chain.

U.S.–China competition angle

SLS/Artemis is central to U.S. leadership in human spaceflight and lunar return; sustaining ML2 counters China's advancing space ambitions.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.003086.

Period of performance
Start
2019-07-01
End
2026-06-05
Status
expired25 days ago
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$1.6B National Aeronautics and Space Administration — The Buildout — The Buildout