$89,699,200
to EXECUTIVE OFFICE OF THE COMMONWEALTH OF KENTUCKY
PROJECT TITLE: SHELBY - I-64 :::: PROJECT DESCRIPTION: WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY-55 INTERCHANGE MP 32.30 TO JUST EAST OF KY-53 UNDERPASS AT MP 38.20. (INCLUDES ITEM NUMBER 5-475)
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds widening of Interstate 64 from 4 to 6 lanes in Shelby, Kentucky across approximately 5.9 miles.
Improves regional highway capacity and traffic flow on a major east-west corridor connecting Louisville and eastern Kentucky.
Drives demand for construction materials, heavy equipment, asphalt, concrete, and engineering services in the Kentucky region.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002154.
- 2026-04-17PROJECT TITLE: LAUREL-WHITLEY COUNTIES | I-75 WIDENING :::: PROJECT DESCRIPTION: WIDENING I-75 FROM MP 20.0 IN WHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN.$141.0M
- 2026-04-17PROJECT TITLE: JEFFERSON- RECONSTRUCT I-264 (WATTERNSON EXPRESSWAY)/US42 INTERCHANGE AS A APUI- DE FOR INTERCHANGE RECONSTRUCTION. :::: PROJECT DESCRIPTION: RECONSTRUCT/WIDEN I-264 (WATTERSON EXPRESSWAY) FROM WESTPORT ROAD (KY-1447) TO I-71, INCLUDING THE US-42 INTERCHANGE AS A SPUI.(PROJECT INCLUDES 5-594)$109.8M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22530000Y001KY0643046_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.