The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/PROJECT GRANT (B)

$62,647,884

Department of Transportation·Federal Highway Administration

to STATE OF SOUTH DAKOTA

WORK BEGAN·LATEST ACTION2026-04-02·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22540000Y404SD0385050_069
Award description

PROJECT TITLE: COUNTY OF PENNINGTON; US385 RECONSTRUCTION :::: PROJECT DESCRIPTION: GRADING, INTERIM SURFACING REPLACE STRUCTURE (RCBC), AC SURFACING, CRACK & SEAT, CURB & GUTTER, AND GUARDRAIL; US385 - FM 1.5 MI N OF US16 TO 4 N OF THE SD44 JCT

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds reconstruction of US Highway 385 in South Dakota, including grading, surfacing, and guardrail installation.

Sub-sectors
highway-infrastructurefhwa-grantroad-reconstruction
Why this matters

Maintains critical rural highway infrastructure connecting communities and supporting regional economic activity.

Supply-chain signal

Drives demand for asphalt, concrete, guardrail materials, and construction equipment suppliers in the region.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002068.

Period of performance
Start
End
2029-01-30
Status
activein 988 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$62.6M Department of Transportation — The Buildout — The Buildout