The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$27,139,821,087

Department of Energy·Department of Energy

to SAVANNAH RIVER NUCLEAR SOLUTIONS LLC

energyactiveONGOING · MOD OF 2008 CONTRACT
WORK BEGAN2008-01-10·LATEST ACTION2026-06-10·SOURCEUSASPENDING·SOURCE IDCONT_AWD_DEAC0908SR22470_8900_-NONE-_-NONE-
Award description

MANAGEMENT AND OPERATING CONTRACT FOR THE SAVANNAH RIVER SITE.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the 2008 Savannah River Site management contract, funding ongoing nuclear weapons production and environmental remediation.

Sub-sectors
nuclear-weapons-complexm&o-contractsavannah-river-site
Why this matters

The Savannah River Site is critical to U.S. nuclear weapons stockpile stewardship and plutonium production; this 18-year contract ensures continuity of weapons-grade material manufacturing.

Supply-chain signal

Sustains the domestic nuclear weapons industrial base and specialized contractors supporting plutonium processing, enrichment, and weapons assembly.

U.S.–China competition angle

Maintains U.S. nuclear weapons production capacity independent of foreign supply chains; directly supports strategic deterrent credibility.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.003033.

Period of performance
Start
2008-01-10
End
2026-09-30
Status
activein 92 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$27.1B Department of Energy — The Buildout — The Buildout