$38,817,184
National Aeronautics and Space Administration·National Aeronautics and Space Administration
WORK BEGAN2022-01-12·LATEST ACTION2026-04-24·SOURCEUSASPENDING·SOURCE IDCONT_AWD_80MSFC21F0313_8000_80SSC018D0017_8000
Award description
THIS IS THE SECOND PHASE OF A MULTI-PHASE PROJECT. PHASE 2 CONSISTS OF THE REMOVAL AND REPLACEMENT.OF THE EXISTING ROOFING SYSTEM IN THE NORTHEAST QUADRANT OF BUILDING 103.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: medium
In plain English
Roofing system removal and replacement in the northeast quadrant of Building 103, phase 2 of a multi-year NASA facility renovation.
Sub-sectors
facility-maintenancecapital-infrastructurebuilding-renovation
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-14. Cost: $0.015803.
Period of performance
Start
2022-01-12
End
2027-04-22
Status
activein 296 days
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_80MSFC21F0313_8000_80SSC018D0017_8000.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.