The BuildoutBeta

$756,432,237

Department of Health and Human Services·National Institutes of Health

to HENSEL PHELPS CONSTRUCTION CO

biotechactive
ACTION DATE·SOURCEUSASPENDING·SOURCE IDCONT_AWD_75N99022F00003_7529_75N99019D00016_7529
Award description

C103157: SURGERY, RADIOLOGY, AND LABORATORY MEDICINE (SRLM) BUILDING CONSTRUCTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Construction of a Surgery, Radiology, and Laboratory Medicine building at an NIH facility.

Sub-sectors
medical-research-infrastructurehealthcare-facilities
Why this matters

Expands NIH research capacity in critical medical specialties supporting drug development and clinical innovation.

Supply-chain signal

Drives demand for specialized medical equipment, laboratory instrumentation, and construction materials for healthcare infrastructure.

U.S.–China competition angle

Strengthens U.S. biomedical research infrastructure to maintain competitive advantage in medical innovation and diagnostics.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-13. Cost: $0.001252.

Period of performance
Start
2022-03-22
End
2029-01-25
Status
activein 987 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.