$130,999,331
to GEORGIA DEPARTMENT OF TRANSPORTATION
PROJECT TITLE: I-285 @ I-20 WEST SIDE INTERCHANGE RECONSTRUCTION & WIDENING, UTL :::: PROJECT DESCRIPTION: I-285 @ I-20 WEST SIDE INTERCHANGE RECONSTRUCTION & WIDENING, UTL
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds reconstruction and widening of the I-285 and I-20 West Side interchange in Georgia through 2040.
Major metropolitan interchange upgrade reduces congestion on critical Atlanta corridor serving regional commerce and commuter traffic.
Drives demand for construction materials, heavy equipment, and engineering services in Georgia's transportation infrastructure sector.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-25. Cost: $0.002708.
- 2026-05-04PROJECT TITLE: I-285 FM PACES FERRY TO HENDERSON MILL;INC SR 400-EXPRESS LN, PE :::: PROJECT DESCRIPTION: I-285 FM PACES FERRY TO HENDERSON MILL;INC SR 400-EXPRESS LN, PE$171.2M
- 2026-03-18PROJECT TITLE: MMIP PROGRAMMATIC OVERSIGHT, PE :::: PROJECT DESCRIPTION: MMIP PROGRAMMATIC OVERSIGHT, PE$170.8M
- 2026-03-18PROJECT TITLE: I-285 FROM CS 843/COLLIER DRIVE TO CR 2838/PACES FERRY ROAD, PE :::: PROJECT DESCRIPTION: I-285 FROM CS 843/COLLIER DRIVE TO CR 2838/PACES FERRY ROAD, PE$134.1M
- 2026-05-04PROJECT TITLE: I-75 @ CR 312/BETHLEHEM ROAD, PE :::: PROJECT DESCRIPTION: I-75 @ CR 312/BETHLEHEM ROAD, PE$125.8M
- 2026-04-17PROJECT TITLE: I-285 FROM CS 2971/MT GILEAD ROAD TO CS 843/COLLIER DRIVE, PE :::: PROJECT DESCRIPTION: I-285 FROM CS 2971/MT GILEAD ROAD TO CS 843/COLLIER DRIVE, PE$78.2M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22330000Y001GA0013918_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.