The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$130,999,331

Department of Transportation·Federal Highway Administration

to GEORGIA DEPARTMENT OF TRANSPORTATION

WORK BEGAN·LATEST ACTION2026-05-04·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22330000Y001GA0013918_069
Award description

PROJECT TITLE: I-285 @ I-20 WEST SIDE INTERCHANGE RECONSTRUCTION & WIDENING, UTL :::: PROJECT DESCRIPTION: I-285 @ I-20 WEST SIDE INTERCHANGE RECONSTRUCTION & WIDENING, UTL

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds reconstruction and widening of the I-285 and I-20 West Side interchange in Georgia through 2040.

Sub-sectors
highway-infrastructurefhwa-formula-grantinterstate-reconstruction
Why this matters

Major metropolitan interchange upgrade reduces congestion on critical Atlanta corridor serving regional commerce and commuter traffic.

Supply-chain signal

Drives demand for construction materials, heavy equipment, and engineering services in Georgia's transportation infrastructure sector.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-25. Cost: $0.002708.

Period of performance
Start
End
2040-12-31
Status
activein 5298 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$131.0M Department of Transportation — The Buildout — The Buildout