$134,102,775
to GEORGIA DEPARTMENT OF TRANSPORTATION
PROJECT TITLE: I-285 FROM CS 843/COLLIER DRIVE TO CR 2838/PACES FERRY ROAD, PE :::: PROJECT DESCRIPTION: I-285 FROM CS 843/COLLIER DRIVE TO CR 2838/PACES FERRY ROAD, PE
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds preliminary engineering for I-285 highway segment improvements between Collier Drive and Paces Ferry Road in Georgia.
I-285 is a critical circumferential interstate around Atlanta; infrastructure investment supports regional economic mobility and freight movement.
Preliminary engineering phase will drive demand for design consultants, engineering firms, and construction planning services in the Southeast.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002104.
- 2026-05-04PROJECT TITLE: I-285 FM PACES FERRY TO HENDERSON MILL;INC SR 400-EXPRESS LN, PE :::: PROJECT DESCRIPTION: I-285 FM PACES FERRY TO HENDERSON MILL;INC SR 400-EXPRESS LN, PE$171.2M
- 2026-03-18PROJECT TITLE: MMIP PROGRAMMATIC OVERSIGHT, PE :::: PROJECT DESCRIPTION: MMIP PROGRAMMATIC OVERSIGHT, PE$170.8M
- 2026-05-04PROJECT TITLE: I-285 @ I-20 WEST SIDE INTERCHANGE RECONSTRUCTION & WIDENING, UTL :::: PROJECT DESCRIPTION: I-285 @ I-20 WEST SIDE INTERCHANGE RECONSTRUCTION & WIDENING, UTL$131.0M
- 2026-05-04PROJECT TITLE: I-75 @ CR 312/BETHLEHEM ROAD, PE :::: PROJECT DESCRIPTION: I-75 @ CR 312/BETHLEHEM ROAD, PE$125.8M
- 2026-04-17PROJECT TITLE: I-285 FROM CS 2971/MT GILEAD ROAD TO CS 843/COLLIER DRIVE, PE :::: PROJECT DESCRIPTION: I-285 FROM CS 2971/MT GILEAD ROAD TO CS 843/COLLIER DRIVE, PE$78.2M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22430000Y001GA0018193_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.