The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$52,413,347

Department of Transportation·Federal Highway Administration

to OREGON DEPARTMENT OF TRANSPORTATION

WORK BEGAN·LATEST ACTION2026-05-19·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22230000Y001ORS004227_069
Award description

PROJECT TITLE: US97 AND US20 BEND NORTH CORRIDOR :::: PROJECT DESCRIPTION: REALIGN US97 INCLUDING BRIDGE OVERPASSES, INTERSECTION IMPROVEMENTS AT US97 AND COOLEY RD., US20 AND COOLEY RD., AND US20 AND ROBAL RD. THESE IMPROVEMENTS WILL REDUCE HIGH SEVERITY CRASHES AND IMPROVE US97 OPERATIONS. PROJECT ALSO INCLUDES OTHER MISCELLANEOUS IMPROVEMENTS INCLUDING PEDESTRIAN IMPROVEMENTS, BRIDGE DECK OVERLAYS, PAVEMENT PRESERVATION, AND ADA UPGRADES.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds realignment of US97 and improvements to US20 near Bend, Oregon, including bridge work, intersection improvements, and ADA upgrades.

Sub-sectors
highway-realignmentintersection-safetybridge-infrastructure
Why this matters

Reduces high-severity traffic crashes and improves accessibility on key regional US highways in Oregon.

Supply-chain signal

Stimulates local construction, concrete, and steel suppliers in the Bend area.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-09. Cost: $0.019209.

Period of performance
Start
End
2028-12-31
Status
activein 915 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.