$40,449,059
to OREGON DEPARTMENT OF TRANSPORTATION
PROJECT TITLE: I-84: FAREWELL BEND - N. FORK JACOBSEN GULCH :::: PROJECT DESCRIPTION: PAVE I-84 INCLUDING REPAVING BRIDGE APPROACH SLABS WITH NEW JOINTS, UPGRADE AND INSTALL NEW WEIGH IN MOTION SYSTEM, INSTALL VARIABLE MESSAGE SIGNS AND ADD LIGHTING TO INCREASE SAFETY, REDUCE CONGESTION AND IMPROVE COMMUNICATIONS FOR THE TRAVELING PUBLIC.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Obligation increment on ongoing I-84 Farewell Bend project (begun 2023) to repave and rehabilitate highway and bridges in Oregon.
Stimulates demand for concrete, asphalt, steel, and traffic safety equipment suppliers.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-13. Cost: $0.011598.
- 2026-05-19PROJECT TITLE: US97 AND US20 BEND NORTH CORRIDOR :::: PROJECT DESCRIPTION: REALIGN US97 INCLUDING BRIDGE OVERPASSES, INTERSECTION IMPROVEMENTS AT US97 AND COOLEY RD., US20 AND COOLEY RD., AND US20 AND ROBAL RD. THESE IMPROVEMENTS WILL REDUCE HIGH SEVERITY CRASHES AND IMPROVE US97 OPERATIONS. PROJECT ALSO INCLUDES OTHER MISCELLANEOUS IMPROVEMENTS INCLUDING PEDESTRIAN IMPROVEMENTS, BRIDGE DECK OVERLAYS, PAVEMENT PRESERVATION, AND ADA UPGRADES.$52.4M
- 2026-05-19PROJECT TITLE: GARVEE SERIES 2024A DEBT SERVICE :::: PROJECT DESCRIPTION: GARVEE SERIES 2024A DEBT SERVICE$39.5M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22530000Y001ORSA00600_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.