The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$357,645,616

Department of the Interior·Bureau of Reclamation

to CDM CONSTRUCTORS INC

environmentactiveONGOING · MOD OF 2017 CONTRACT
WORK BEGAN2017-02-21·LATEST ACTION2026-06-24·SOURCEUSASPENDING·SOURCE IDCONT_AWD_INR17PC00023_1425_-NONE-_-NONE-
Award description

POJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the Pojoaque Basin Regional Water System, a multi-year infrastructure project that began in 2017.

Sub-sectors
water-infrastructureregional-water-systembureau-of-reclamation
Why this matters

Addresses water supply and management for the Pojoaque Basin region in New Mexico; critical for drought-prone Southwest water security and tribal water rights.

Supply-chain signal

Sustains demand for large-scale water infrastructure construction and engineering services through 2027 completion.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-18. Cost: $0.002787.

Period of performance
Start
2017-02-21
End
2027-02-28
Status
activein 243 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$357.6M Department of the Interior — The Buildout — The Buildout