The BuildoutBeta

$357,845,763

Department of the Interior·Bureau of Reclamation

to CDM CONSTRUCTORS INC

energyactive
ACTION DATE·SOURCEUSASPENDING·SOURCE IDCONT_AWD_INR17PC00023_1425_-NONE-_-NONE-
Award description

POJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Constructs regional water system infrastructure for the Pojoaque Basin to provide reliable water supply.

Sub-sectors
water-infrastructureregional-water-systems
Why this matters

Critical water infrastructure investment in the Southwest addresses long-term water security and supports regional economic development.

Supply-chain signal

Large construction award signals demand for engineering, construction materials, and water system equipment suppliers.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-13. Cost: $0.001122.

Period of performance
Start
2017-02-21
End
2027-02-28
Status
activein 290 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.