The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$544,973,076

Smithsonian Institution·Smithsonian Institution

to CLARK/SMOOT/CONSIGLI, A JOINT VENTURE

environmentexpiredONGOING · MOD OF 2017 CONTRACT
WORK BEGAN2017-01-09·LATEST ACTION2026-03-17·SOURCEUSASPENDING·SOURCE IDCONT_AWD_F17CC10103_3300_-NONE-_-NONE-
Award description

IGF::OT::IGF PRE-CONSTRUCTION SERVICES, NATIONAL AIR&SPACE MUSEUM REVITALIZATION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Pre-construction services for the National Air & Space Museum revitalization project, a multi-year Smithsonian facility upgrade that began in 2017.

Sub-sectors
museum-infrastructuresmithsonian-revitalizationpre-construction-services
Why this matters

The Smithsonian's flagship aviation museum serves millions of annual visitors; this 2017-launched revitalization modernizes critical national cultural infrastructure.

Supply-chain signal

This modification on an existing contract signals ongoing demand for construction management, design coordination, and pre-construction planning services in major federal renovation projects.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002876.

Period of performance
Start
2017-01-09
End
2024-08-23
Status
expired676 days ago
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$545.0M Smithsonian Institution — The Buildout — The Buildout