The BuildoutBeta

$255,325,449

Department of Agriculture·Forest Service

to KIEWIT INFRASTRUCTURE SOUTH CO

otheractive
ACTION DATE·SOURCEUSASPENDING·SOURCE IDCONT_AWD_12445126C0001_12C2_-NONE-_-NONE-
Award description

MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Design-build reconstruction and disaster recovery work for Hurricane Helene damage in Virginia.

Sub-sectors
disaster-recoveryinfrastructure-reconstruction
Why this matters

Emergency infrastructure restoration following major hurricane; critical for regional recovery and resilience.

Supply-chain signal

Will drive demand for construction materials, equipment, and labor in Southeast region during recovery phase.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-13. Cost: $0.001099.

Period of performance
Start
2025-11-06
End
2027-03-31
Status
activein 321 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.