The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$297,667,560

Department of Energy·Department of Energy

to SAVANNAH RIVER MISSION COMPLETION, LLC

energyactiveONGOING · MOD OF 2023 CONTRACT
WORK BEGAN2023-10-01·LATEST ACTION2026-06-15·SOURCEUSASPENDING·SOURCE IDCONT_AWD_89303723FEM400293_8900_89303322DEM000068_8900
Award description

THIS AWARD IS FOR THE SAVANNAH RIVER INTEGRATED MISSION COMPLETION CONTRACT - TASK ORDER 7 (TANK AND ANCILLARY FACILITIES CLOSURE).

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the 2023 Savannah River tank closure contract to decommission nuclear weapons production facilities and ancillary infrastructure.

Sub-sectors
nuclear-weapons-complexenvironmental-remediationm&o-contract
Why this matters

Savannah River is a legacy nuclear weapons site; tank closure is critical to the DOE's decades-long environmental remediation mission and nuclear security posture.

Supply-chain signal

Sustains demand for specialized nuclear decommissioning contractors, engineering firms, and hazardous-waste handling vendors through 2031.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-19. Cost: $0.002914.

Period of performance
Start
2023-10-01
End
2031-10-26
Status
activein 1944 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$297.7M Department of Energy — The Buildout — The Buildout