The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$2,373,307,167

Department of Energy·Department of Energy

to SAVANNAH RIVER MISSION COMPLETION, LLC

energyactiveONGOING · MOD OF 2023 CONTRACT
WORK BEGAN2023-10-01·LATEST ACTION2026-06-01·SOURCEUSASPENDING·SOURCE IDCONT_AWD_89303723FEM400292_8900_89303322DEM000068_8900
Award description

THIS AWARD IS FOR THE SAVANNAH RIVER INTEGRATED MISSION COMPLETION CONTRACT - TASK ORDER 6 (LIQUID WASTE OPERATIONS).

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the 2023 Savannah River liquid waste operations contract, supporting nuclear site cleanup and waste management through 2031.

Sub-sectors
nuclear-waste-managementm&o-contractweapons-stockpile-related
Why this matters

Savannah River is a legacy nuclear weapons production site; liquid waste operations are critical to environmental remediation and nuclear security infrastructure.

Supply-chain signal

Sustains specialized contractors and subcontractors in nuclear remediation, engineering, and waste handling—a concentrated supply base with few qualified competitors.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-17. Cost: $0.002895.

Period of performance
Start
2023-10-01
End
2031-10-26
Status
activein 1944 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$2.4B Department of Energy — The Buildout — The Buildout