$270,116,821
to JACOBS PROJECT MANAGEMENT CO.
SAN JUAN LATERAL WATER TREATMENT PLANT
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Modification to the San Juan Lateral Water Treatment Plant contract, which began in August 2024 and is scheduled through December 2029.
Water treatment infrastructure supports agricultural irrigation and public water supply in the Colorado River Basin, critical to the Southwest's drought resilience.
Jacobs Project Management's role as prime suggests ongoing demand for engineering, procurement, and construction management services in federal water infrastructure.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-19. Cost: $0.002764.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_140R4024C0013_1425_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.