$263,353,827
General Services Administration·Public Buildings Service
transportationactive
ACTION DATE2026-04-08·SOURCEUSASPENDING·SOURCE IDCONT_AWD_47PH0825F0006_4740_47PH0821D0004_4740
Award description
DESIGN BUILD CONSTRUCTION FOR GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT, BROWNSVILLE, TX.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Design-build construction to modernize the Gateway Land Port of Entry in Brownsville, Texas.
Sub-sectors
border-infrastructureport-modernization
Why this matters
Modernizing critical border infrastructure improves trade efficiency and security at a major U.S.-Mexico crossing.
Supply-chain signal
Signals demand for construction materials, engineering services, and border facility equipment suppliers.
Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-14. Cost: $0.001145.
Period of performance
Start
2024-12-13
End
2029-03-06
Status
activein 1026 days
Sources
- Award record ingested from usaspending. Source identifier CONT_AWD_47PH0825F0006_4740_47PH0821D0004_4740.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.