The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$147,588,356

Department of Justice·Federal Bureau of Investigation

to BRASFIELD & GORRIE LLC

justiceactiveONGOING · MOD OF 2025 CONTRACT
WORK BEGAN2025-09-17·LATEST ACTION2026-05-11·SOURCEUSASPENDING·SOURCE IDCONT_AWD_15F06725C0001016_1549_-NONE-_-NONE-
Award description

A: PROJECT TITLE: PRACTICAL PROBLEM VENUE (PPV) B: SET ASIDE: NONE/FULL AND OPEN C: MAGNITUDE OF CONSTRUCTION: ESTIMATED BETWEEN 100,000,001 AND $250,000,000.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: medium
In plain English

Construction or renovation of the FBI's Practical Problem Venue facility, a training or operational infrastructure project estimated between $100M–$250M.

Sub-sectors
fbi-infrastructureconstruction-m&ofederal-facilities
Why this matters

This 2025-initiated project represents significant FBI capital investment in domestic law-enforcement infrastructure; the May 2026 obligation increment signals project acceleration or scope expansion mid-execution.

Supply-chain signal

Large construction contract to Brasfield & Gorrie (major U.S. general contractor) will drive demand for building materials, skilled trades, and subcontractor capacity over the 2025–2028 performance window.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-24. Cost: $0.002987.

Period of performance
Start
2025-09-17
End
2028-05-19
Status
activein 689 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$147.6M Department of Justice — The Buildout — The Buildout