The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$216,965,500

Department of the Interior·National Park Service

to STRONGHOLD ENGINEERING INC

environmentactiveONGOING · MOD OF 2023 CONTRACT
WORK BEGAN2023-03-14·LATEST ACTION2026-03-25·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140P2023C0001_1443_-NONE-_-NONE-
Award description

GRCA 190083 / 250176 - IMPROVE POTABLE WATER SUPPLY TO INNER-CANYON AND SOUTH RIM, TRANS-CANYON WATER DISTRIBUTION PIPELINE, GRAND CANYON NATIONAL PARK, AZ

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Upgrade potable water supply and trans-canyon pipeline infrastructure at Grand Canyon National Park, Arizona.

Sub-sectors
national-parkswater-infrastructurenps-capital-projects
Why this matters

Critical infrastructure modernization ensures reliable water access for park operations and visitor services across one of America's most visited national parks.

Supply-chain signal

Ongoing project requires sustained procurement of pipeline materials, engineering services, and construction labor through 2027.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-21. Cost: $0.002741.

Period of performance
Start
2023-03-14
End
2027-02-08
Status
activein 223 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$217.0M Department of the Interior — The Buildout — The Buildout