$217,742,923
to KIEWIT INFRASTRUCTURE WEST CO.
YOSE 196416 REHABILITATE EL PORTAL WASTEWATER TREATMENT FACILITY AND ADMINISTRATIVE CAMP THE WORK OF THIS CONTRACT IS FOR THE CONSTRUCTION OF: YOSE 196416 REHABILITATE EL PORTAL WASTEWATER TREATMENT FACILITY AND ADMINISTRATIVE CAMP IN YOSEMITE NAT
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Rehabilitation of El Portal wastewater treatment facility and administrative camp infrastructure in Yosemite National Park.
Maintains critical environmental and operational infrastructure in one of America's most visited national parks, ensuring water quality and visitor services.
Ongoing construction project signals sustained demand for heavy civil engineering, wastewater treatment equipment, and construction materials through April 2026.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-21. Cost: $0.002802.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_140P2025C0038_1443_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.