Latest obligation on the 1993 Lockheed Martin nuclear-weapons-related contract, a decades-long Department of Energy stewardship program.
This represents sustained U.S. investment in nuclear-stockpile maintenance and security—a core strategic deterrent capability—now receiving a 2026 modification after 33 years of continuous work.
Lockheed Martin's dominant role in DOE weapons-complex operations locks in supplier relationships across nuclear engineering, materials science, and specialized manufacturing for the next contract cycle.
Sustained nuclear-stockpile stewardship underpins U.S. strategic deterrence against peer competitors including China; this modification ensures continuity of that capability.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-29. Cost: $0.003091.
- 2026-05-06TAS::80 0124::TAS DESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION$15.5B
- 2026-05-21THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTENSIVE SPATIAL RANGE (GLOBAL, REGIONAL AND LOCAL) ON A VARIETY OF TIME SCALES. THESE DATA INCLUDE, BUT ARE NOT LIMITED TO: GLOBAL IMAGERY; CLOUD AND PRECIPITATION PARAMETERS; ATMOSPHERIC PROFILES OF TEMPERATURE, MOISTURE, WINDS, AEROSOLS, AND OZONE; SURFACE CONDITIONS CONCERNING ICE, SNOW AND VEGETATION; OCEAN PARAMETERS AND SEA-SURFACE TEMPERATURE; AND SOLAR AND IN-SITU SPACE ENVIRONMENT CONDITIONS. THE STATEMENT OF WORK (SOW) DEFINES THOSE TASKS TO DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, EVALUATE, DELIVER GOES-R SERIES SATELLITES AND SUPPORT LAUNCH AND POST LAUNCH, SUPPLY AND MAINTAIN THE GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE NOAA SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES, AND OTHER RESOURCES TO DESIGN, VALIDATE, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, AND DELIVER GOES-R SERIES SATELLITES AND PROVIDE PRE-LAUNCH, LAUNCH, AND POST-LAUNCH SUPPORT AND TRAINING UNDER THE BASIC CONTRACT, AND OPTIONS WHEN EXERCISED BY THE GOVERNMENT.$2.0B
- 2026-05-19ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.$441.3M
- 2026-05-06THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.$347.8M
- 2026-05-27RISK REDUCTION AND PHASE B EFFORT IN SUPPORT OF THE MARS ATMOSPHERIC AND VOLATILE EVOLUATION (MAVEN) PROJECT. THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE MAVEN PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM, WHICH CONSISTS OF THE INTEGRATED SPACECRAFT AND SCIENCE PAYLOADS IN ACCORDANCE WITH THE STATEMENT OF WORK.$301.0M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_DEAC0494AL85000_8900_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.