The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$438,374,601

National Aeronautics and Space Administration·National Aeronautics and Space Administration

to LOCKHEED MARTIN CORP

aerospaceactiveONGOING · MOD OF 2024 CONTRACT
WORK BEGAN2024-07-01·LATEST ACTION2026-06-10·SOURCEUSASPENDING·SOURCE IDCONT_AWD_80GSFC24CA001_8000_-NONE-_-NONE-
Award description

DESIGN BUILD AND DELIVER 3 GEOXO SPACECRAFT

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Modification on the 2024 GEOXO program to design, build, and deliver three weather observation satellites.

Sub-sectors
satellite-spacecraftweather-observationnasa-contract
Why this matters

Critical U.S. investment in next-generation weather satellites essential for national forecasting and climate monitoring.

Supply-chain signal

Drives demand for satellite instruments, launch services, and advanced manufacturing from aerospace supply chain.

U.S.–China competition angle

U.S. maintains weather satellite dominance against China's expanding Earth observation capabilities in geostationary orbit.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-12. Cost: $0.021168.

Period of performance
Start
2024-07-01
End
2048-06-30
Status
activein 8052 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$438.4M National Aeronautics and Space Administration — The Buildout — The Buildout