$125,218,072
to GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC.
TASK ORDER 0001 FOR WCOSS PHASE 1. BBA FUNDED
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
IT infrastructure and systems support for NOAA's Weather and Climate Operational Supercomputing System Phase 1.
WCOSS is critical national infrastructure for weather forecasting, hurricane prediction, and climate monitoring that protects lives and economy.
Large IT systems integrator contract signals demand for high-performance computing infrastructure and specialized weather modeling software capabilities.
Advanced weather prediction capabilities are strategically important; U.S. invests heavily to maintain superiority in forecasting and climate science infrastructure.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002195.
- 2026-04-29GLOBAL SECURITY ENGINEERING&SUPPLY CHAIN SERVICES.$1.5B
- 2026-04-06AWARD OF TASK ORDER 47QFCA210051-NAWCAD WOLF SHIP AND AIR C5ISR SYSTEMS SUPPORT$832.3M
- 2026-04-23INFRASTRUCTURE SUPPORT SERVICES (ISS) IGF::OT::IGF$461.4M
- 2026-04-24MANAGED APPLICATION, INFRASTRUCTURE, NETWORKING, ENTERPRISE, AND SECURITY SERVICES (MAINES) IN SUPPORT OF THE ENVIRONMENTAL PROTECTION AGENCY (EPA)$418.9M
- 2026-04-28THE PURPOSE OF THIS IS TO INCREMENTALLY FUND AND AWARD THE CITS TASK ORDER.$308.6M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_1305M420FNWWA0037_1330_1305M420DNWWX0076_1330.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.