$186,972,654
FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Latest obligation on the FKC Middle Reach Capacity Correction Project Phase 1, a Bureau of Reclamation water infrastructure initiative that began in 2021.
Reclamation projects address water supply, flood control, and hydroelectric capacity across the West—critical as drought and climate pressures intensify.
BWI TPC (joint venture) is the prime contractor; this modification likely signals scope changes, cost adjustments, or schedule extensions on multi-year civil works.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-22. Cost: $0.002866.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_140R2022C0001_1425_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.