The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$168,112,735

National Aeronautics and Space Administration·National Aeronautics and Space Administration

to SOUTHWEST RESEARCH INSTITUTE

aerospaceactiveONGOING · MOD OF 2002 CONTRACT
WORK BEGAN2002-03-15·LATEST ACTION2026-04-30·SOURCEUSASPENDING·SOURCE IDCONT_AWD_HQTR0200204DNASW02008_8000_-NONE-_-NONE-
Award description

NEW HORIZON -- PLUTO MISSION PHASE B

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the New Horizons Pluto mission, which began in 2002 and continues through 2029.

Sub-sectors
nasa-space-explorationpluto-missionongoing-contract-modification
Why this matters

New Horizons is NASA's flagship deep-space probe; this 24-year effort represents sustained U.S. commitment to outer-planet exploration and planetary science leadership.

Supply-chain signal

Ongoing funding sustains Southwest Research Institute's mission operations, data analysis, and spacecraft command infrastructure—critical for maintaining continuity in deep-space mission control.

U.S.–China competition angle

U.S. deep-space exploration capability demonstrates technological leadership in autonomous systems, long-duration spacecraft operations, and planetary science—areas where China is rapidly advancing.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-23. Cost: $0.003074.

Period of performance
Start
2002-03-15
End
2029-09-30
Status
activein 1188 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$168.1M National Aeronautics and Space Administration — The Buildout — The Buildout