$42,056,990
National Aeronautics and Space Administration·National Aeronautics and Space Administration
to SOUTHWEST RESEARCH INSTITUTE
active
ACTION DATE—·SOURCEUSASPENDING·SOURCE IDCONT_AWD_80GSFC24F0001_8000_80GSFC20D0021_8000
Award description
DEVELOPMENT OF THE QUICKSOUNDER SC AND THE QUICKSOUNDER SATELLITE, INTEGRATION OF THE ATMS EDU, SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPS & SATELLITE ACTIVATION, 3 YRS OF MISSION OPS & PERFORM DECOMMISSIONING OPERATION
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
Period of performance
Start
2023-10-25
End
2029-08-29
Status
activein 1203 days
Other awards from this recipient
- —TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION$384.6M
- —NEW HORIZON -- PLUTO MISSION PHASE B$168.1M
- —IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS.$72.4M
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_80GSFC24F0001_8000_80GSFC20D0021_8000.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.