$46,470,615
Department of Health and Human Services·Food and Drug Administration
WORK BEGAN2023-06-02·LATEST ACTION2026-02-19·SOURCEUSASPENDING·SOURCE IDCONT_AWD_75F40123C00057_7524_-NONE-_-NONE-
Award description
BLDG. 2 - CHILLER PLANT CONSTRUCTION AND ASSOCIATED PROJECTS
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Latest obligation on the 2023 FDA chiller plant construction project, with work scheduled through 2029.
Sub-sectors
federal-facility-infrastructurehvac-systemsm&o-contract
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-11. Cost: $0.011194.
Period of performance
Start
2023-06-02
End
2029-02-18
Status
activein 964 days
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_75F40123C00057_7524_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.