The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$188,785,117

Department of Transportation·Federal Highway Administration

to DEPARTMENT OF TRANSPORTATION CALIFORNIA

transportationactiveONGOING · MOD OF 2025 CONTRACT
WORK BEGAN2025-06-12·LATEST ACTION2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22530000Y001CA00PE026_069
Award description

PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds preliminary engineering and planning for California statewide highway projects under the 2025–2029 program cycle.

Sub-sectors
highway-infrastructurefhwa-formula-grantpreliminary-engineering
Why this matters

Formula grants to states for transportation planning ensure consistent federal investment in highway readiness and project development across regions.

Supply-chain signal

Preliminary engineering work generates demand for consulting, design, and environmental assessment services in California's transportation sector.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-22. Cost: $0.002748.

Period of performance
Start
2025-06-12
End
2029-06-30
Status
activein 1096 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$188.8M Department of Transportation — The Buildout — The Buildout