The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$184,025,500

Department of Transportation·Federal Highway Administration

to DEPARTMENT OF TRANSPORTATION CALIFORNIA

transportationactiveONGOING · MOD OF 2022 CONTRACT
WORK BEGAN2022-09-20·LATEST ACTION2026-03-18·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22530000Y001CA0105052_069
Award description

PROJECT TITLE: IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

The latest obligation on a 2022 California highway rehabilitation project: resurfacing and shoulder repairs on State Route 10 in Riverside County near the Arizona border.

Sub-sectors
highway-rehabilitationfhwa-formula-grantpavement-maintenance
Why this matters

Maintains critical cross-state freight corridor infrastructure; routine formula-grant increment on multi-year FHWA program.

Supply-chain signal

Supports demand for asphalt, concrete, and heavy construction equipment suppliers serving California DOT projects.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-22. Cost: $0.002898.

Period of performance
Start
2022-09-20
End
2029-04-03
Status
activein 1008 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$184.0M Department of Transportation — The Buildout — The Buildout