$90,583,070
to ODIN ENVIRONMENTAL SOLUTIONS, LLC
CONSTRUCTION OF AMERICAN CANAL LOWER REACH REPLACEMENT
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Construction of replacement infrastructure for the American Canal lower reach along the U.S.-Mexico border.
Critical binational water management infrastructure affecting agricultural water supply and border region sustainability.
Signals demand for heavy construction contractors, concrete suppliers, and water infrastructure engineering firms capable of large-scale border projects.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.001979.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_191BWC23C0006_19BM_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.