The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$115,307,833

Department of Transportation·Federal Highway Administration

to TEXAS DEPARTMENT OF TRANSPORTATION

ACTION DATE2026-04-02·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22230000Y001TX2022009_069
Award description

PROJECT TITLE: WIDEN ROAD-ADD LANES ON IH 45. :::: PROJECT DESCRIPTION: IH 45 FROM 0.3 MILES NORTH OF SH 19 TO SH 30; FROM SH 30 TO 0.9 MILES NORTH OF SH 30. WIDEN ROAD - ADD LANES.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds widening and lane expansion on Interstate 45 in Texas between State Highway 19 and State Highway 30.

Sub-sectors
highway-infrastructurefhwa-formula-grantroad-expansion
Why this matters

I-45 is a critical north-south corridor; capacity improvements support regional commerce and freight movement.

Supply-chain signal

Drives demand for construction materials, heavy equipment, and engineering services in Texas transportation infrastructure.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002080.

Period of performance
Start
End
2032-03-01
Status
activein 2115 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$115.3M Department of Transportation — The Buildout — The Buildout